Concrete pool decks in Monrovia CA - a deck that grips when wet and stays cooler
Old deck cracked, slick when wet or too hot to stand on? We rebuild or resurface it so it grips and stays comfortable underfoot.
Request an estimate
What goes into a new concrete pool deck?
A concrete pool deck in Monrovia is the slab around your pool that people walk on wet and barefoot, so we build it to grip, stay comfortable in the sun, drain away from the pool and crack only where we've planned for it.
Most calls start with a deck that's cracked, lifted at the coping, slick when it's wet or too hot to cross barefoot in the afternoon. The price moves mostly with the size of the deck, whether the old concrete has to come out and be hauled off, how much work the ground underneath needs and the finish you pick. The schedule turns on that same tear-out, on whether the city wants a permit, and on curing, the days new concrete needs to harden before anyone walks on it. Your own number comes from the estimate, where I measure the deck and write down what's included, like removal and hauling, so you know what the price covers.
How we build and resurface concrete pool decks
It starts with the deck you have. Before I tell you a new surface will hold, I look hard at the old concrete, and if a coating would only hide a slab that's sinking or breaking up, I'll say so rather than sell it to you. When the deck comes out, our crew breaks it up, hauls it off and checks the subgrade, the ground the slab sits on, then digs out the soft dirt and packs a firm base instead of raking it level. We set the slope so water runs away from the pool and the house, and we lay out control joints, cut lines that give the concrete a planned place to crack as it shrinks, plus a flexible joint where the deck meets the coping so the slab doesn't push against the pool. I'll walk you through that layout before we pour. Then we pour, give it a finish that grips when it's wet and stays cooler in the sun, and let it cure. If the budget gets tight, I'd cut the fancy finish before I'd cut the base, because nobody sees the base on the first day but it decides whether the deck stays flat.
A pool deck rarely stands alone. If there's a step down from the back door or a change in level across the yard, we can pour concrete steps with the same finish so the walk to the water feels like one surface. If you're adding a pool house or a shed for the equipment, our slab foundation building work gives it a level base, and doing both together usually means one round of digging and one cleanup.
Building concrete pool decks in Monrovia
Monrovia's Building and Safety office issues building permits, and whether your deck needs one depends on the job, so we check with the city before we set a date. The city suggests checking with its Planning Division on zoning first, then meeting with Building and Safety staff to find out whether plan review is needed, and whoever pulls the permit brings a copy of their workers' compensation insurance. A dumpster in the street or work in the public right-of-way, the sidewalk and street out front, takes a separate city encroachment permit. If your job needs a permit, we sort out who pulls it and get it in hand before work starts.
Summer afternoons here get hot, so we start pours early instead of fighting the midday heat that leaves a weak, dusty top. Many of the pools we see around Monrovia have older decks with tired joints where water has been getting underneath, and we see the same thing on jobs in Arcadia and Pasadena.
Pool deck finishes up close
Get a pool deck estimate at your house
We reply within one business day to set a time for me to come out and walk the deck. The estimate is free, done at your property, and there's no pressure to book.
(626) 879-0614Pool deck questions from Monrovia homeowners
Which pool deck finish grips best when it's wet?
A finish with real texture, like a broom finish with fine ridges dragged into the surface, usually grips better wet than a smooth one. Broom, textured, exposed aggregate, coatings, overlays and decorative finishes all differ in grip and in heat underfoot, and very dark colors get uncomfortable in full sun. On a sunny deck we steer you toward a lighter color with a surface that holds your feet.
How do I know if my pool deck can be resurfaced instead of replaced?
Have the old deck looked at first, because a coating over existing concrete only works when that concrete is a good candidate. If the slab is flat and solid, resurfacing can make sense. If it's sinking, heaving or breaking up, a new surface won't fix what's under it, and I'll tell you that at the estimate.
How much does a concrete pool deck cost in the Los Angeles area?
A concrete pool deck in the Los Angeles area usually costs about $6.50 to $13 per square foot. That's the going rate for the work around here, not our quote, and where your deck lands depends on tear-out, base work and the finish you choose. Your own price comes from the estimate, written out with what's included.
Who handles permits for a pool deck in Monrovia?
The city issues building permits, and we check whether your deck needs one before we set a date, as laid out above. You can see the city's steps on its apply for a permit page.
How do I take care of the joint where my pool deck meets the coping?
Check that joint once a year and replace the caulk when it cracks, pulls away or breaks down. One coping maker's guide gives that advice and notes most elastomeric caulks, the flexible joint sealant, last five to ten years. A failed joint lets water get under the deck, so it's worth the look.
What causes cracks in a deck poured around a new pool?
Often it's the fill around the new pool shell settling after the deck goes down. That fill needs to be placed and packed properly, so on a new pool we ask how it went in and check it before we pour.
Get your Monrovia pool deck looked at
Call (626) 879-0614 or send the form, because a fresh crack or a failed joint is a lot easier to deal with before water spends another season getting under the deck.
